Construction at Coral Condo Samui is progressing smoothly this October, with the concrete structures taking shape on site in Lamai. Our latest drone photographs, captured on 16 October 2026, offer a closer look at the floor slabs, columns and structural work now visible across the development.
The structure comes into view
The photographs show several sections of the development at different stages of structural construction. Concrete slabs and columns define the emerging buildings, while scaffolding, temporary supports and column formwork remain in place. Projecting reinforcement is visible above the slabs, and the curved edges of the buildings are becoming easier to recognise.

Closer views show the structural framework around the central site area, with construction materials stored nearby. These images give buyers a useful view of the build as it stands this month, from the overall layout to the details of the concrete frame.

EIA and building permit approved
Both the Environmental Impact Assessment (EIA) and the building permit have been approved. With these approvals in place, construction is moving forward and the project continues to progress smoothly.
Clear milestones and practical details for buyers
Alongside the visible progress, the sample sale and purchase agreement sets out construction milestones for staged payments. These include the structure reaching roof level, completion of wall construction, painting and door and window installation, and completion of the unit interiors. This gives buyers a clear description of the building stages associated with the instalments, subject to the terms of their individual agreement.
The sample agreement also specifies seller responsibility for structural defects for five years and construction defects arising from normal use for one year, measured from condominium registration. These provisions describe responsibilities beyond the construction period itself.
For the one-bedroom residence illustrated in the sample agreement, the attached specification lists built-in furniture, a kitchen with a sink, loose furniture, appliances and air-conditioning. It gives buyers a practical picture of the proposed home, with the final inclusions governed by the agreement and specification for their chosen residence.

October photo gallery



Watch the October construction update
Watch our October construction update for a moving view of Coral Condo Samui. The drone footage moves from the Lamai coastline to an overview of the site, then closer to the concrete slabs, rising columns and scaffolded structures. Ground-level views show materials stored beside the buildings and workers on site, bringing the scale of the ongoing structural work into focus.
Watch the October construction update on YouTube · Video by MyThai.House
Follow the progress
We look forward to sharing more from the site as Coral Condo Samui continues to take shape. To learn more about the project, request current availability or arrange a site visit, contact our team at sales@coralcondosamui.com or +66 637 387 455.




